[esp-r] mznuma: climate file error @ rec 7
Paul
paulnee at xplornet.com
Tue Apr 24 18:38:12 BST 2018
Whenever I try to use any file from the /opt database I get the error:
mznuma: climate file error @ rec 7
This happens for all the files.
What am I doing wrong?
It works fine with the default data.
I tried generating a .clm from a .epw file.
The conversion went fine but I got the same simulator error.
I'm running Kubuntu 16.04.
The simulator output is below.
The .cfg file is attached.
Thanks,
Paul
--------------
Copyright resides with the member organisations of the ESP-r
development consortium as listed at:
http://www.esru.strath.ac.uk/Programs/ESP-r_central.htm.
Build information:
SVN source - @r (locally modified)
Platform - x86_64:Linux:4.10.0-37-generic
Compilers - gcc/g++/gfortran
Graphics library - GTK
XML output - Unsupported
Preferences (esprc) file - standard version.
The input file is: /home/paul/gh2h/cfg/gh2.cfg
A systems and building simulation start-up period of 2 days has been
specified.
Climate data: ESP : 1967
Climate data: Toro: 2001
Resetting results file record width to 40
Library file: /home/paul/gh2.res
Simulation run with configuration file:
/home/paul/gh2h/cfg/gh2.cfg
Climate file : /opt/esru/esp-r/climate/CAN_ON_Toronto_CWEC
Configuration file : gh2.cfg
Configuration name : greenhouse
Control strategy : free-floating
Zone save option : 4 (Energy Balance)
No. of warnings : 0
Simulation period : 7 day(s)
period: Thu-09-Jan at 01h00 - Wed-15-Jan at 24h00
Start-up period : 2 day(s)
Zone time-steps : 1 / hr ( 60.00 min. intervals saved at
each timestep)
Number of zones : 1
Zone-time increments : 216
Zone results db size : 722.8 Kbytes
Time-step controller : Not active
Simulation has now commenced.
mznuma: climate file error @ rec 7
Zones library simulation no. 1
Results saved for the period from day 9 of month 1
to day 15 of month 1
-------------- next part --------------
* CONFIGURATION4.0
# ESRU system configuration defined by file
# gh2.cfg
*date Tue Apr 24 13:13:20 2018 # latest file modification
*root gh2
*zonpth ../zones # path to zones
*netpth ../nets # path to networks
*ctlpth ../ctl # path to controls
*aimpth ../aim2 # path to aim2 files
*radpth ../rad # path to radiance files
*imgpth ../images # path to project images
*docpth ../doc # path to project documents
*dbspth ../dbs # path to local databases
*hvacpth ../hvac # path to hvac files
*bsmpth ../bsm # path to BASESIMP files
*radcore 1 # number of cores available to Radiance
*indx 1 # Building only
43.500 -4.100 # Latitude & Longitude (diff from time meridian)
1 0.200 # Site exposure & ground reflectivity
* DATABASES
*stdmat material.db4.a
*stdcfcdb CFClayers.db2.a
*stdmlc multicon.db5
*stdopt optics.db2
*stdprs pressc.db1
*stdevn profiles.db2.a
*stdclm clm67
*stdmscldb mscomp.db1
*stdmould mould.db1 # mould isopleths
*stdpdb plantc.db1
*stdsbem SBEM.db1
*stdpredef predefined.db1
*slr_half_hr 0 # solar timing hour centred
*quick_run 0 # no
*calename standard weekday Sat Sun hol
*calentag weekdays, weekdays (all year), 260
*calentag saturday, Saturdays (all year), 52
*calentag sunday, Sundays (all year), 52
*calentag holiday, holiday, 1
*list 4
4,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,
1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,
2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,
1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,
1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,
3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,
1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,
1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1,1,1,2,3,1,1,1
*end_list
*seasons
*name Default UK clm Climate
*aide Climate data as distributed with ESP-r for testing purposes.
*winter_s 1 1 12 3 30 10 31 12 # seasons Wed-01-Jan--Wed-12-Mar & Thu-30-Oct--Wed-31-Dec
*spring_s 13 3 14 5 4 9 29 10 # seasons Thu-13-Mar--Wed-14-May & Thu-04-Sep--Wed-29-Oct
*summer_s 15 5 3 9 # summer season Thu-15-May--Wed-03-Sep
*winter_t 6 2 12 2 20 11 26 11 # typical Thu-06-Feb--Wed-12-Feb & Thu-20-Nov--Wed-26-Nov
*spring_t 17 4 23 4 2 10 8 10 # typical Thu-17-Apr--Wed-23-Apr & Thu-02-Oct--Wed-08-Oct
*summer_t 3 7 9 7 # typical summer Thu-03-Jul--Wed-09-Jul
*help_start
Location is 52.0N and 0.0E. The solar radiation is Direct Normal.
Month Minimum Time Maximum Time Mean
Jan -6.4 @20h00 Sun 8 12.7 @14h00 Sun 29 3.8
Feb -1.9 @ 5h00 Tue 14 12.2 @13h00 Thu 2 5.2
Mar -0.8 @24h00 Fri 31 16.1 @15h00 Tue 21 6.8
Apr -1.9 @ 2h00 Sat 1 19.4 @15h00 Mon 17 7.1
May 0.0 @ 3h00 Wed 3 22.7 @14h00 Thu 11 10.4
Jun 5.0 @ 2h00 Fri 9 21.1 @15h00 Tue 6 13.6
Jul 9.4 @ 3h00 Mon 3 27.7 @12h00 Mon 17 18.0
Aug 7.7 @ 4h00 Sat 5 24.4 @12h00 Tue 1 15.6
Sep 5.0 @ 6h00 Thu 21 22.2 @12h00 Tue 26 13.5
Oct 2.2 @ 5h00 Mon 30 19.4 @13h00 Sat 7 10.8
Nov -0.8 @ 5h00 Mon 27 14.4 @14h00 Sat 11 5.2
Dec -4.2 @ 1h00 Sat 9 12.7 @ 9h00 Sat 23 3.8
All -6.4 @20h00 Sun 8 Jan 27.7 @12h00 Mon 17 Jul 9.5
Typical winter week begins Monday 6 Feb,
Typical spring week begins Monday 17 April,
Typical summer week begins Monday 3 July.
Typical autumn week begins Monday 2 October.
Typical winter week begins Monday 20 November,
*season_end
*year 1997 # assessment year
*water_in_zones 0.6 998.2 4190.0 0.0 # water cond density spec ht shortwave abs
# sim setup: no. sets startup zone_ts plant_ts save_lv @ each ts
*sps 1 2 1 10 4 0
9 1 15 1 default # period & name
*sblr gh2.res
*end_set
*end_sps
# Name and address of building
*B-NAME not yet defined
*B-ADDRESS not yet defined
*B-CITY not yet defined
*B-POSTCODE not yet defined
# Contact information for building owner
*O-NAME not yet defined
*O-ADDRESS not yet defined
*O-CITY not yet defined
*O-POSTCODE not yet defined
*O-TELEPHONE not yet defined
# Contact information for simulation team
*C-NAME not yet defined
*C-ADDRESS not yet defined
*C-CITY not yet defined
*C-POSTCODE not yet defined
*C-TELEPHONE not yet defined
* PROJ LOG
../doc/gh2.log
* Building
greenhouse
1 # no of zones
*zon 1 # reference for zone1
*opr ../zones/zone1.opr # schedules
*geo ../zones/zone1.geo # geometry
*con ../zones/zone1.con # construction
*tmc ../zones/zone1.tmc # transparent constr
*ivf ../zones/zone1.vwf # viewfactors
*isi ../zones/zone1.shd # shading db
*zend
*cnn gh2.cnn # connections
0 # no fluid flow network
More information about the esp-r
mailing list