Hi everyone,<div><br></div><div>I&#39;m modelling a school building and after defining everything in the model including internal gains, ventilation network and all control functions I found out that I want to include the effect of closing the school during the summer vacations.</div>

<div><br></div><div>In this specific model that means that during that period all days would be similar to &quot;Sundays&quot;. Hence, I tried to modify the standard calendar and define all the days of the vacation period as Sundays but that doesn&#39;t seem to have any effect on the simulations (I was careful to save the model before closing esp-r). The .cfg file seems to keep the information in the relevant part but reopening the model with esp-r shows that the calendar reverts to the standard day order.</div>

<div><br></div><div>Am I missing something? Shouldn&#39;t this work?</div><div><br></div><div>Thanks in advance for all the help. Regards,</div><div><br></div><div>Hugo Santos</div><div>Faculty of Engineering of the University of Porto</div>