Hi everyone,<div><br></div><div>I'm modelling a school building and after defining everything in the model including internal gains, ventilation network and all control functions I found out that I want to include the effect of closing the school during the summer vacations.</div>
<div><br></div><div>In this specific model that means that during that period all days would be similar to "Sundays". Hence, I tried to modify the standard calendar and define all the days of the vacation period as Sundays but that doesn't seem to have any effect on the simulations (I was careful to save the model before closing esp-r). The .cfg file seems to keep the information in the relevant part but reopening the model with esp-r shows that the calendar reverts to the standard day order.</div>
<div><br></div><div>Am I missing something? Shouldn't this work?</div><div><br></div><div>Thanks in advance for all the help. Regards,</div><div><br></div><div>Hugo Santos</div><div>Faculty of Engineering of the University of Porto</div>